Here we see a transmission line, from a power plant, to supply fuel to small tankers moored at a jetty. (250 meters away)
Some of the ballast concrete blocks had to be removed because over time they slid down and began to compress the pipe.
Instead of concrete blocks, 30 X JLD 2.2 anchors were installed, connected with a clamp to secure the transport pipe to the seabed.
"The JLD-Anchor-2.2 was an excellent choice " (Satisfied customer)