PROJECTS | UTILITY ANCHORING
JLD International provides a fast and efficient anchoring solution for railroad operations, power and telecommunications networks and other utilities.
[/su_column][/su_row]
[/section]
UTILITY ANCHORING | BREEZANDDIJK
[smartslider3 slider=6]
⇧
In the Friesian part of the IJsselmeer, near Breezanddijk, 89 wind turbines will be installed. This park will provide 340,000 households with renewable electricity annually starting in 2020.
In order to measure the projected energy production in advance, a wind measurement mast was installed at Breezanddijk. To keep this mast in place, the guy wires are attached to JLD Clap anchors. After all measurements are completed, the anchors will be removed again.
[section bg="white" color="inherit"]
UTILITY ANCHORING | ENERCON
[smartslider3 slider=7]
⇧
In preparation for the construction of the Netherlands' largest wind farm in Zeewolde, Enercon has installed a wind measurement mast with a height of 120 meters. This mast will collect data over a period of several years.
JLD installed JLD Clap anchors that are attached to guy wires to anchor the mast.
[/section]
[section bg="#0079C2″ color="inherit"]
More information? Download your brochure, specification text and calculation sheet here
[button url="/brochures" text="Brochure"] [button url="/calculation-sheet-requests" text="Calculation-sheet"] [button url="/bestek-description-requests/" text="Specification text"]
[/section]