PROJECTS | SHEET PILE ANCHORING
The JLD Sheet Pile Anchor is applicable for various sheet pile anchorages, including wood, steel and plastic. Based on anchor strength and soil data (soundings), a suitable anchor design can be created, delivered and installed for each situation.
[/su_column][/su_row]
[/section]
SHEET PILING ANCHORAGE | WINSCHOTERDIEP
[smartslider3 slider=31]
⇧
The Winschoterdiep is the canal that runs from Groningen, from its junction with the Eemskanaal, to Winschoten.
This project concerns the north side from km 6,250 to 7,688 and km 7,718 - 9,750, located in the municipality of Midden-Groningen.
JLD International provided the anchor design and supply of the anchor materials for the project to replace shoring Winschoterdiep.
As many as 2,772 pieces of JLD anchor sets were delivered in total for this project, consisting of JLD Anchors, anchor rods, nuts and steel sheet pile anchor seats.
[section bg="white" color="inherit"]
DAM WALL ANCHORING | THE DOCK
[smartslider3 slider=22]
⇧
Jachthaven 't Dok is a beautiful marina located in Delfzijl.
Commissioned by the Province of Groningen, part of the embankment of the Eemskanaal has been renewed.
In accordance with specifications, JLD International made the anchor design and supplied the materials.
JLD Contracting took care of the placement of the JLD Anchors. Number of anchors: 224 pieces.
[/section]
SHEET PILE ANCHORING | CONSTRUCTION PIT FORTUNA POLDER
[smartslider3 slider=26]
⇧
Because the demand for drinking water will increase and to optimize the pre-purification of the Gijster, a new intake pumping station will be built on the bank of the Bergsche Maas in the Fortuna Polder. To transport drinking water from the pumping station to the reservoir, three transmission lines will be constructed. Temporary construction pits are required to lay the transport pipes. To ensure that the sheet pile walls do not collapse under pressure, a strut frame or an anchoring system can be used. The advantage of using anchors is that the cofferdam remains accessible for various equipment. For the Fortunapolder project, JLD provided the design, delivery, installation and testing of 100 anchors and accessories.
[section bg="white" color="inherit"]
DAM WALL ANCHORING | VINKEVEENSE PLASSEN
[smartslider3 slider=9]
⇧
The Vinkeveense Plassen is a nature and water sports area. Commissioned by the Recreation Board Stichtse Groenlanden, approximately 3.6 kilometers of bank protection has been replaced. For the anchoring JLD International supplied approximately 1,200 anchors with accessories.
[/section]
SHEET PILE ANCHORAGE | DARK
[smartslider3 slider=10]
⇧
The stretch between Amsterdam and Wijk bij Duurstede involves 120km of sheet piling. Of the 120 km of sheet piling, 25 km is at the end of its technical lifespan. The current sheet pile walls along the Amsterdam-Rhine Canal are 30 to 70 years old. Several measures have been designed to renovate the sheet pile walls. Depending on the status of the sheet pile walls, the best solution is applied. The solutions JLD Contracting has contributed to involve anchoring the completely new structures or anchoring the existing structures and thus extending their life span. The work was carried out largely from a pontoon. Of the 70 sections present, approximately 20 were anchored with JLD Klapankers with lengths of up to 23 meters.
[section bg="white" color="inherit"]
DAM WALL ANCHORING | QUAY PURMEREND
[smartslider3 slider=23]
⇧
[/section]
DAM WALL ANCHORING | SPAARNDAMSEWEG
[smartslider3 slider=11]
⇧
It concerns a work in Haarlem where partial replacement and reinforcement was the goal. A new section of steel sheet piling was installed and 350 meters of concrete quay had to be anchored to stabilize the construction.After Schouls Brothers from Leiden accepted the work after the tender, JLD Contracting has been continuously involved in optimizing the anchoring construction and the plans for the execution.The anchors were recalculated, special anchor chairs were developed and a special test yoke had to be built to test the anchors.
Since there were many obstacles in the water (floating jetties, an old Navy ship, several houseboats), the anchors were mostly placed from the shore.
Because of buildings close to the quay, anchors also had to be placed from the water. In consultation with the residents, the houseboats were temporarily relocated and the anchoring work was carried out. Both the residents, client and main contractor are more than satisfied with the work performed by JLD Contracting.
[section bg="white" color="inherit"]
DAM WALL ANCHORING | THE IJ
[smartslider3 slider=21]
⇧
[/section]
[section bg="#0079C2″ color="inherit"]
More information? Download your brochure, specification text and calculation sheet here
[button url="/brochures" text="Brochure"] [button url="/calculation-sheet-requests" text="Calculation-sheet"] [button url="/bestek-description-requests/" text="Specification text"]
[/section]