12 meter long piles
On the beach of Texel, next to Paal 17, JLD Contracting bv had the opportunity to work on a new pile foundation for Club 17. For the installation of these piles, team JLD went to work and placed the 12-meter long piles at the predetermined depth at a rapid pace. A beautiful project on the beach of Texel!
Project in pictures (youtube)