JLD DIKE STABILIZER | IMPLEMENTATION
[su_row]
[su_column size="1/3″]
In the test the dike was rejected for the failure mechanism
mechanism of internal macrostability.
[/su_column]
[su_column size="1/3″]
The JLD Anchor machine is used to install the JLD Clap anchors and the star-shaped element (LDE), in this process no measurable deformation and vibration take place.
[/su_column]
[su_column size="1/3″]
The JLD Dike Stabilizer is composed of 4 components: JLD Clap Anchor, tie rod made of basalt fiber, a fin-shaped element (LDE) and a head plate (LDP) made of plastic.
[/su_column]
[/su_row]
[su_row]
[su_column size="1/3″]
After placing the head plate (LDP) with the data pot (ODP), the sensor is activated, then the soil is returned and the embankment is reseeded.
[/su_column]
[su_column size="1/3″]
The play of forces at saturation dike. The JLD Dike Stabilizer not only provides reinforcement, but also ensures that the dike can "communicate", if necessary, targeted action can be taken .
[/su_column]
[su_column size="1/3″]
There is limited space on the characteristic dike with its historic buildings. With the JLD Dike Stabilizer, the character of the dike is not affected.
[/su_column]
[/su_row]
[section bg="#0079C2″ color="inherit"]
More information? Download your brochure, specification text and calculation sheet here
[button url="/brochures" text="Brochure"] [button url="/calculation-sheet-requests" text="Calculation-sheet"] [button url="/bestek-description-requests/" text="Specification text"]
[/section]
[section bg="white" color="inherit"]
[flexbox]
[flexitem]
UPDATE
[/flexitem]
[flexitem]
OPERATION
[/flexitem]
[flexitem]
EXECUTION
[/flexitem]
[flexitem]
PROJECTS
[/flexitem]
[/flexbox]
[/section]
[section bg=”/wp-content/uploads/sites/6/2019/12/Schermafbeelding-2019-12-23-om-13.23.30.png”]
[/section]