Category Archives: Cases

Plastic dam wall_Longside railroads_swing_JLDinternationalBV

Plastic sheet piling along the track | Tiel - Kesteren

𝐃𝐚𝐦𝐰𝐚𝐧𝐝𝐞𝐧 𝐥𝐚𝐧𝐠𝐬 𝐡𝐞𝐭 𝐬𝐩𝐨𝐨𝐫, 𝐤𝐮𝐧𝐬𝐭𝐬𝐭𝐨𝐟 𝐝𝐚𝐦𝐰𝐚𝐧𝐝 𝐢𝐬 𝐝𝐚𝐚𝐫 𝐩𝐞𝐫𝐟𝐞𝐜𝐭 𝐯𝐨𝐨𝐫!

There are some important factors to consider when installing sheet piles along the track. One of these factors is rusting off due to stray currents. Due to these stray currents released along the railroad system, steel materials corrode faster which negatively affects the durability of the product. In order to meet an optimal price/sustainability requirement, the use of plastic sheet piles is often highly appropriate.

✨ Why Plastic Sheet Piling!
- Corrosion-resistant
- Cost-saving
- Durable
- Easy installation

🔧 𝐏𝐫𝐨𝐣𝐞𝐜𝐭: 𝐓𝐢𝐞𝐥-𝐊𝐞𝐬𝐭𝐞𝐫𝐞𝐧
16 mounds of plastic dam wall, have been constructed on behalf of Hamer Infra by team JLD, along the railroad between Tiel and Kesteren. The JLD 610/9 plastic sheet pile wall profile was used for this purpose. The purpose of the mounds is to enclose the soil behind, so that a switch box can be placed on top. A nice project where the application of the plastic sheet pile walls comes into its own.

Do you see opportunities within your project for the application of JLD Plastic Sheet Piling?

Contact us and we will be happy to think with you.
Via 0299-622396

Beach posts_places_Fluideren_Post 17_ JLDinternationalBV

New pile foundation Paal 17, Texel.

New pile foundation Paal 17, Texel.

On the beach of Texel, next to Paal 17, JLD Contracting Bv had the opportunity to work on a new pile foundation for pavilion Zomers - Paal 17. For the installation of these piles, team JLD went to work and placed the 12-meter long piles at the predetermined depth at a rapid pace. A beautiful project on the beach of Texel!

 

#SUSTAINABLE TUESDAY | FLOATING SOLAR


#SUSTAINABLE TUESDAY | FLOATING SOLAR

"Be part of the SOLUTION"

The first Tuesday of September is Sustainable Tuesday. A special day when sustainable ideas and initiatives get a stage in political The Hague.
JLD is the solution for anchoring your sustainable energy. We provided anchor design, delivery and installation (anchoring) including testing of the anchors for this floating PV installation (Floating-Solar) at this water treatment depot.

JLD can prepare an anchor design for floating PV installations that complies with the International Standard (Eurocode 7). The actual anchor supply and installation including testing of the anchors can be provided by JLD. Our expertise is building in partnership, JLD International , innovative on the border of land and water.

#solar #floating #sustainable #JLDcontracting #JLD #clap anchor #anchoring #deliver #bank